Pricing Guides7 min read526 words

Electrical Contractor Pricing: What to Charge in 2026

Electrical pricing guide — hourly rates by region, per-outlet pricing, panel upgrades, and commercial vs residential rate differences.

Electrician hourly rate: $50-$130. Panel upgrade: $1,500-$4,000. Here's every rate.

Hourly Rates by Experience and Region

LevelLow COLMedium COLHigh COL
Apprentice$25-$40/hr$35-$55/hr$45-$65/hr
Journeyman$50-$75/hr$65-$95/hr$80-$130/hr
Master electrician$75-$100/hr$90-$120/hr$100-$150/hr

Service call minimum: $75-$150 (includes first hour + travel)

Per-Item Pricing (Residential)

ServicePrice RangeTimeNotes
Outlet install$150-$300/each30-60 minStandard 15A/20A
GFCI outlet$175-$350/each30-60 minRequired: kitchen, bath, garage, outdoor
Light switch$100-$250/each20-45 minSingle pole or 3-way
Dimmer switch$125-$275/each20-45 minSmart dimmer higher
Ceiling fan install$150-$4001-2 hoursExisting box, add $100-$200 for new box
Recessed light$150-$300/each30-60 minNew construction vs retrofit pricing varies
Chandelier install$200-$5001-2 hoursDepends on weight and ceiling height
USB outlet$175-$325/each30-60 minCombo USB-A/C
Smoke detector (hardwired)$150-$300/each30-60 minPlus interconnection
Outdoor lighting$200-$500/fixture1-2 hoursLandscape/security

Panel and Major Work

ServicePrice RangeTimeNotes
100A to 200A panel upgrade$1,500-$4,0006-10 hoursIncludes permit
Sub-panel install$800-$2,0004-6 hours60A-100A
Whole house rewire$8,000-$20,0003-7 daysDepends on size and access
EV charger install (Level 2)$500-$1,5002-4 hours240V, 40-50A circuit
Generator hookup (manual)$500-$1,0003-5 hoursTransfer switch + wiring
Generator hookup (automatic)$1,500-$3,5004-8 hoursAutomatic transfer switch
Hot tub/spa wiring$500-$1,5003-5 hours240V, 50A dedicated
Dedicated circuit$200-$5001-3 hoursAppliance or shop

Commercial vs Residential

FactorResidentialCommercial
Hourly rate$50-$130$75-$175
Markup on materials25-40%15-25%
Permit handlingOften includedUsually separate
Insurance requirementsStandard GLHigher limits required
Payment termsDue on completionNet 30 common
Profit margin20-35%15-25% (higher volume)

Markup Formula

Materials × 1.25 to 1.40 = material charge

MaterialYour CostMarkupCharge
Romex 12/2 (250ft)$7535%$101
200A panel$200-$40030%$260-$520
GFCI outlet$15-$2540%$21-$35
Breaker$8-$3035%$11-$41

How to Quote Electrical Work Fast

thecontractor.app has electrical-specific templates — per-outlet pricing, panel upgrades, dedicated circuits, all pre-loaded with market rates. Describe the job, the AI writes the scope. Send professional quotes in 60 seconds. Free to start.

Ready to try it?

Create AI-powered quotes, schedule jobs, and manage your business — free.

Start Free

Related tools & resources

More articles